Skip to content
AI in Healthcare

Article

The HTI-2 60-day sprint: what certified vendors and health systems need to have landed before January 1, 2027

ONC's attestation portal is live and enforcement begins January 1. The practical 60-day checklist for vendors and health systems that have to ship the HTI-2 compliance artifact.

By Jordan Reeves Updated
  • ONC
  • HTI-2
  • DSI
  • compliance
  • certification
  • health IT
  • AI governance
  • attestation

The HTI-2 compliance calendar collapsed into a 60-day window on November 3. ONC opened the attestation portal, published the final DSI JSON schema, and set the first live enforcement cycle to cover Q1 2027 with filings due April 30. The 45-day grace window — attestations filed through December 18 that will not count against the first enforcement cycle — is the only slack the industry is going to get.

For certified EHR vendors and the health systems that run their installations, the next 60 days are the sprint window in which the compliance artifact either gets built operationally or does not. This piece is the practical checklist for that sprint — organized by the three distinct workstreams that each organization has to run in parallel, with explicit decision points and the questions to ask when a decision is still open.

Workstream one: the DSI inventory

The Decision Support Intervention inventory is the gating artifact. Nothing else in the HTI-2 compliance package is reviewable without it. It is a one-time structured submission, in the ONC JSON schema published November 3, that lists every predictive algorithm, embedded decision support rule, and AI-enabled feature that influences a clinical decision inside the certified installation. For large health systems, the inventory can contain hundreds of entries.

The 60-day checklist for the inventory workstream.

Week one: scoping completeness audit. The single most common failure mode in HTI-2 scoping is undercounting — organizations miss AI-enabled features that are embedded in third-party modules, in vendor-provided clinical content packs, or in locally developed decision-support rules whose AI dependency is not documented. The scoping audit should cross-reference three sources: the EHR vendor’s list of AI-enabled features in the certified installation, the health system’s own clinical application inventory, and the IT security review log for any model or algorithm introduced in the last 36 months. The intersection of those three is the DSI inventory starting population.

Weeks two through four: source-attribute collection. For each DSI inventory entry, the source attributes have to be populated: model inputs, outputs, intended use, training-data characteristics, performance across subpopulations, uncertainty characteristics, and known limitations. The subpopulation performance field is the one that trips up the most vendors, because it requires either an original validation study with the right demographic breakdowns or a post-market monitoring dataset with enough statistical power to characterize the differential. Vendors whose original 510(k) or de novo submission did not include the subpopulation data will need to decide between filing a limitation-flagged entry (allowed, but creates procurement friction) and running a validation study inside the compliance window (expensive and probably impossible in 60 days).

Weeks five and six: JSON schema validation. The portal will reject malformed submissions. The November 3 schema has specific validation rules on required fields, cardinality constraints on performance characterizations, and format constraints on identifiers. Dry-run the full inventory against a local schema validator before the portal submission. This step is where a lot of the first-cycle grace-window filings are going to end up — not because the data is wrong but because the format is.

Weeks seven and eight: the public-posting review. The DSI inventory submission becomes part of the public certification record. Every entry, every limitation flag, every subpopulation performance characterization becomes publicly readable. Legal, procurement, and marketing should review the inventory before submission for anything that has downstream business implications — a known performance differential in a population the system actively markets to, a vendor limitation that contradicts a procurement claim, a model version that is older than the one the vendor is currently selling.

Workstream two: the quarterly attestation

The attestation is a separate artifact from the inventory. It is an operational sign-off by a named accountable executive that the inventory is current and the live production deployment matches it. The first attestation cycle covers Q1 2027 and is due April 30, 2027, but the organizational apparatus to produce it has to be built now.

The 60-day checklist for the attestation workstream.

Identify the named accountable executive. The attestation signature is personal: a named individual at the organization vouches that the inventory is accurate and that the live production deployment matches it. The default choice is a Chief Medical Information Officer or Chief Information Officer, but the right choice depends on who has the authority to compel inventory accuracy across the organization. In large health systems, the accountable executive sometimes has to be the CMIO with written sign-offs from service-line clinical leaders. In EHR vendors, it tends to be a Chief Compliance Officer or the equivalent. Picking this person in week one, and giving them staff support in weeks two through eight, is the single highest-leverage structural choice in the sprint.

Build the live-deployment reconciliation pipeline. The attestation is quarterly. Every quarter, the attesting executive has to confirm that the DSI inventory matches what is actually deployed. This requires a reconciliation pipeline: an automated feed from the production environment that compares active AI-enabled features against the current inventory, flags drift, and surfaces remediation requirements. The pipeline does not have to be sophisticated — a nightly comparison script that produces an exception report is enough — but it does have to exist, and it has to be designed in a way that generates an audit trail the executive can defend.

Establish the correction procedure. The attestation is meaningless if the organization has no documented procedure for correcting inventory errors between cycles. ONC’s framework treats the correction procedure as part of the compliance posture: an organization with a clean inventory and a documented correction procedure is in good standing even when individual entries get corrected mid-cycle; an organization that corrects entries without a documented procedure looks like it is masking drift. Write the procedure now, publish it internally, and reference it in the attestation sign-off.

Workstream three: the audit-readiness posture

ONC’s enforcement framework explicitly includes random audit sampling of live customer installations. For EHR vendors, this means that the compliance posture is not just about what you submit — it is about what an ONC auditor will find when they look at an actual production deployment at a random customer site. The audit posture has to be built in parallel with the inventory and attestation workstreams.

The 60-day checklist for the audit-readiness workstream.

Pick three canonical customer installations and dry-run the audit. For an EHR vendor, the audit risk is that the submitted DSI inventory accurately describes the “reference” installation but diverges from what is actually running at individual customer sites — customer-specific configurations, locally developed clinical content, deferred updates. Pick three customer installations that represent the range of customer configuration variability and run the inventory reconciliation against each one. The gaps that surface are the pattern that will repeat in actual audits.

Build the customer-facing attestation tooling. Customers of certified EHR installations are also subject to HTI-2 on their deployed footprint. They need to be able to see the DSI inventory for their installation, confirm it matches their configured deployment, and flag any customer-specific additions that need to be added to their own attestation. The vendor-side tooling for this is almost always underbuilt relative to where it needs to be on January 1. The 60-day window is an opportunity to close the gap.

Document the model-update governance process. When a cleared model is updated — a routine occurrence for ML-based decision support — the DSI inventory has to be updated. ONC’s framework treats model update governance as a leading indicator of compliance maturity. Organizations that have a documented, repeatable process for updating the DSI inventory in response to model changes are better positioned for the first audit cycle than organizations whose process is ad hoc.

The questions that are still open

Three questions are not yet definitively resolved by the November 3 portal launch, and organizations should be tracking the answers as they arrive.

The first is how ONC will handle attestations that flag material limitations — subpopulation performance gaps, missing validation data, known model drift. The framework language says these are acceptable if accurately disclosed, but the practical question is whether procurement counterparties will treat them as acceptable. Early-cycle attestations with heavily limitation-flagged inventories are a test case the market has not yet run.

The second is the interaction between HTI-2 attestation and FDA post-market surveillance for cleared AI devices. The two frameworks overlap but are not integrated; the operational burden for vendors who have to produce both sets of documentation on different cycles is substantial, and the ONC–FDA relationship on data-sharing is still being built. Expect clarifying guidance in Q1 2027.

The third is whether the attestation data will be used in private litigation. The DSI inventory and the quarterly attestations create a public, timestamped record of what a vendor or health system knew about model performance and when. Plaintiffs’ attorneys are watching the portal launch as closely as compliance officers are. The first discovery request that cites a DSI inventory entry against a vendor is coming, and the industry’s defensible posture will shift when it arrives.

What success looks like on January 1

An organization that finishes the 60-day sprint in a defensible position has five artifacts in place: a complete, schema-valid DSI inventory submitted to the portal before the December 18 grace cutoff; a named accountable executive with the authority and staff support to attest quarterly; a reconciliation pipeline that compares the submitted inventory to the live deployment; a documented correction procedure; and an audit-readiness posture that has been dry-run against representative customer installations.

The organizations that have those five artifacts on January 1 will be in the healthy part of the enforcement distribution. The organizations that are still assembling any of them when the first audit lands in Q2 2027 will be in the attention-drawing part. The 60-day window is the choice between the two postures, and the window closes faster than most compliance calendars assume.